Over 200 successfully completed projects in Germany, Austria and Switzerland.
Through years of work in the DACH region we have built a rich portfolio of industrial projects. Each one reflects our approach — quality, precision and on-time delivery.
Complete installation of heating, cooling and ventilation for a production facility of 8,000 m². Includes automatic controls and BMS integration.
Complete electrical fit-out of a 15,000 m² logistics center with remote monitoring systems, UPS and emergency lighting.
Assembly of steel load-bearing structures for factory hall expansion. Total structure weight 320 tonnes, completed within 6 weeks.
TIG welding of stainless steel process pipelines (AISI 316L) for a pharmaceutical plant. All welds accompanied by full NDT inspection.
Design and installation of a heat pump heating system for a 5,500 m² industrial hall. Energy saving of 40% compared to the previous system.
Electrical connection and commissioning of a complete automated production line with 42 frequency converters and a PLC control system.
Assembly and levelling of 4 industrial compressors with a combined weight of 180 tonnes at an energy plant. Works completed with minimal plant downtime.
Fabrication and site welding of structural steel working platforms (S355) for a refinery plant. All works certified to EN 1090.
Design and installation of a hygienic ventilation system for a food production facility to HACCP standards and VDI 6022 guidelines.
Get in touch and let's talk about your requirements. We look forward to a long-term partnership.